Section 13 – Aynho Jnct, Birmingham, Wolverhampton & North Warwickshire Line – From September 1951
Pages 1 (map) & 2 (contents) are missing.
Routes covered:
A) Alcester to Bearley Branch.
B) Aynho Jnct to Wolverhampton, Dudley & Stourbridge Jnct.
C) Birmingham to Bristol & Bearley to Leamington Spa.
D) Halesowen to Old Hill plus Halesowen to Northfield Joint Railway.
E) Oldbury & Langley Green to Oldbury Branch.
F) Pages & Pages of Technical Data – Banbury & Leamington Target Engines, Banbury Jnct & Eastern Region Exchange, Banking & Shunting Engines, Dimension of Vehicles, Engine Groups & Classes of Traffic, Maximum Speeds & Loads, Point to Point Running Times, Victoria Basin Pilot Trips etc.
AYNHO, BHM, WOLV & N WARKS FROM SEP51 A.pdf
AYNHO, BHM, WOLV & N WARKS FROM SEP51 B.pdf
AYNHO, BHM, WOLV & N WARKS FROM SEP51 C.pdf
Posted in Working Timetables - (WTT)